Monday was like Christmas. My Rockler Bearing and my center foot arrived. The center foot box had been cut open for inspection. I guess Homeland Security doesn't like small, heavy packages that contain large amounts of steel.
So, tonight I finally had time to head to the garage and work on mounting my bearing.

The v4 Frame is tapped in 4 places for a 1/4" screw, so I marked off 4 of the 8 partial holes for drilling out. Once the holes were drilled and the tape CAREFULLY removed I checked the holes to be sure that everything fit well.


Now that I have that done, its back to the waiting game again. I am currently waiting on my PSI's and my 300mm Dome to arrive.
I'm also trying to find a way to get in on both of the current runs of aluminum legs and steel outer feet which is difficult when you are on a budget.
I think that budget and run timing will continue to be a problem for me. I was introduced to the group by Chris, who has built an impeccable droid, with all aluminum. After seeing such an amazing piece of work, I have a hard time compromising on other materials for parts.
Having said that, I will probably be using resin for any of the blue parts and also for the half moon foot details. That will save me some money (and weight) without compromising the look in any way.
No comments:
Post a Comment